RCL Construction has undertaken successful building works at two water treatment works.

Chester wastewater treatment works.

The building works included

  • Cleaning of walls, beams and floor to remove grease, oil and dirt,

  • Removal of kitchen units

  • Decoration works to ceiling and block wall

  • Installation of new partition

  • Repairs to steel framed sky light on the flat roof of the generator building

  • Alterations to the Centrifuge building including installation of ‘Screw Conveyor lifting beam and supports, installation of a electric motorised lifting beam trolley and hoist, industrial roller shutter door.

Five Fords water treatment works

  • Construction of new welfare building

  • Installing external windows and doors

  • Building internal walls

  • Lay flooring

  • Install internal doors

  • Decoration throughout